January 24, 2011


We came to robotics on Saturday. The first thing Bianca and I did was fix the victors. We started and finished mounting all the other components going on the robot.We started wiring the motors and the fans to the power distribution board. We also wired the motors with the motor speed controllers. Frank from team 39 showed up with their prototype pole climber. The prototype is able to climb the pole in 3.5 seconds. That is a pretty cool being able to climb that distance in 3.5 seconds. Today we finished wiring the motors to the power distribution board. Diserae, Daisy and I started on the AUV schematics.