We came to robotics on Saturday. The first thing Bianca and I did was fix the victors. We started and finished mounting all the other components going on the robot.We started wiring the motors and the fans to the power distribution board. We also wired the motors with the motor speed controllers. Frank from team 39 showed up with their prototype pole climber. The prototype is able to climb the pole in 3.5 seconds. That is a pretty cool being able to climb that distance in 3.5 seconds. Today we finished wiring the motors to the power distribution board. Diserae, Daisy and I started on the AUV schematics.
20110124
January 24, 2011
We came to robotics on Saturday. The first thing Bianca and I did was fix the victors. We started and finished mounting all the other components going on the robot.We started wiring the motors and the fans to the power distribution board. We also wired the motors with the motor speed controllers. Frank from team 39 showed up with their prototype pole climber. The prototype is able to climb the pole in 3.5 seconds. That is a pretty cool being able to climb that distance in 3.5 seconds. Today we finished wiring the motors to the power distribution board. Diserae, Daisy and I started on the AUV schematics.
20110120
January 20, 2011
Today was a really busy day. We had to redo many blue reqs. because the school board wants every student now to sign the paper personally. Diserae and I copied all the senators emails so we can send them emails. We finished the final touches for the schematics. The schematics look really good in my opinion. We will start mounting the components in the robot.
20110111
January 11, 2011
I have not blogged for a long time. I believe the game for this year is not that exciting. The only thing I found amusing about it was the mini bot. We have been busy doing paper work all these past week. We will be going to Flagstaff this week to go help the Coconuts with FTC. That is pretty much it.
Subscribe to:
Posts (Atom)